SAP 043-603-030 - Grading & Paving CSAH 3 from CSAH 9 to ECLShafer Contracting Co. Inc. Mathiowetz Construction S.M. Hentges & Son, Inc. Knife River Midwest, LLC PCI Roads Duininck, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2011.601CONSTRUCTION SURVEYINGLS1$55,000.00$55,000.00$51,000.00$51,000.00$112,992.87$112,992.87$87,197.07$87,197.07$49,650.00$49,650.00$49,570.00$49,570.00
2021.501MOBILIZATIONLS1$115,000.00$115,000.00$223,890.50$223,890.50$331,143.47$331,143.47$90,784.72$90,784.72$141,950.00$141,950.00$128,000.00$128,000.00
2101.511CLEARING AND GRUBBINGLS1$10,000.00$10,000.00$5,667.00$5,667.00$5,780.00$5,780.00$5,840.97$5,840.97$5,667.00$5,667.00$7,000.00$7,000.00
2104.501REMOVE PIPE CULVERTSL F1,028$10.00$10,280.00$6.00$6,168.00$6.35$6,527.80$6.08$6,250.24$5.90$6,065.20$8.25$8,481.00
2104.513SAWING BITUMINOUS PAVEMENT (FULL DEPTH)L F140$10.00$1,400.00$2.25$315.00$2.30$322.00$2.32$324.80$2.25$315.00$2.25$315.00
2105.604GEOTEXTILE FABRIC TYPE IS Y42$25.00$1,050.00$6.00$252.00$3.41$143.22$4.12$173.04$4.00$168.00$5.00$210.00
2105.607HAUL AND STOCKPILE EXCESS MATERIALC Y4,054$10.00$40,540.00$6.99$28,337.46$9.13$37,013.02$15.46$62,674.84$24.00$97,296.00$22.00$89,188.00
2106.501EXCAVATION - COMMON (P)C Y69,716$4.00$278,864.00$2.58$179,867.28$2.08$145,009.28$2.68$186,838.88$2.60$181,261.60$1.94$135,249.04
2106.523COMMON EMBANKMENT (CV) (P)C Y79,714$3.50$278,999.00$2.58$205,662.12$3.48$277,404.72$5.67$451,978.38$5.50$438,427.00$6.68$532,489.52
2106.619SURFACE PREPARATIONRDST90$100.00$9,000.00$50.00$4,500.00$399.67$35,970.30$427.74$38,496.60$415.00$37,350.00$360.00$32,400.00
2111.501TEST ROLLING (P)RDST90$100.00$9,000.00$30.00$2,700.00$326.00$29,340.00$72.15$6,493.50$70.00$6,300.00$115.00$10,350.00
2123.501COMMON LABORERSHOUR40$100.00$4,000.00$75.00$3,000.00$90.14$3,605.60$87.61$3,504.40$85.00$3,400.00$80.00$3,200.00
2123.509DOZERHOUR20$150.00$3,000.00$189.00$3,780.00$179.70$3,594.00$185.53$3,710.60$180.00$3,600.00$165.00$3,300.00
2123.610TRACTOR MOUNTED BACKHOE-LOADERHOUR40$150.00$6,000.00$140.00$5,600.00$225.81$9,032.40$185.53$7,421.20$180.00$7,200.00$140.00$5,600.00
2211.501AGGREGATE BASE CLASS 5TON9,912$15.00$148,680.00$14.75$146,202.00$13.38$132,622.56$19.33$191,598.96$18.80$186,345.60$23.00$227,976.00
2215.501FULL DEPTH RECLAMATION (P)S Y26,975$1.08$29,133.00$5.57$150,250.75$5.70$153,757.50$3.24$87,399.00$2.60$70,135.00$5.50$148,362.50
2215.604INCORPORATION OF LIQUID STABILIZING MATERIAL (P)SY31,736$0.38$12,059.68$0.62$19,676.32$0.43$13,646.48$0.72$22,849.92$1.29$40,939.44$1.00$31,736.00
2221.501SHOULDER BASE AGGREGATE CLASS 5 MODTON1,986$15.65$31,080.90$18.86$37,455.96$9.83$19,522.38$20.61$40,931.46$27.25$54,118.50$20.00$39,720.00
2232.501"MILL BITUMINOUS SURFACE (3.0"")" (P)S Y23,992$0.42$10,076.64$1.80$43,185.60$1.08$25,911.36$1.80$43,185.60$1.62$38,867.04$1.50$35,988.00
2301.504"PLACE CONCRETE PAVEMENT 8""" (P)S Y25,299$8.00$202,392.00$5.55$140,409.45$7.52$190,248.48$5.68$143,698.32$5.55$140,409.45$5.55$140,409.45
2301.508SUPPLEMENTAL PAVEMENT REINFORCEMENTLB2,200$2.00$4,400.00$1.70$3,740.00$3.87$8,514.00$3.34$7,348.00$1.70$3,740.00$1.70$3,740.00
2301.511STRUCTURAL CONCRETE (P)C Y5,594$98.00$548,212.00$103.50$578,979.00$101.30$566,672.20$107.69$602,417.86$103.50$578,979.00$103.50$578,979.00
2301.601Concrete W/C Ratio Incentive/DisincentiveLump Sum1$15,000.00$15,000.00$15,000.00$15,000.00$15,000.00$15,000.00$15,000.00$15,000.00$15,000.00$15,000.00$15,000.00$15,000.00
2301.602"1.25"" DOWEL BAR"EACH6,586$5.42$35,696.12$7.45$49,065.70$5.80$38,198.80$7.52$49,526.72$7.45$49,065.70$7.45$49,065.70
2357.502BITUMINOUS MATERIAL FOR TACK COATGAL408$5.00$2,040.00$5.00$2,040.00$5.10$2,080.80$2.06$840.48$4.00$1,632.00$2.50$1,020.00
2360.501TYPE SP 12.5 WEARING COURSE MIXTURE (2,C)TON454$84.00$38,136.00$84.00$38,136.00$85.68$38,898.72$83.49$37,904.46$101.00$45,854.00$88.00$39,952.00
2360.502TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C)TON1,132$79.00$89,428.00$79.00$89,428.00$80.58$91,216.56$81.94$92,756.08$92.50$104,710.00$87.50$99,050.00
2399.601Concrete Ride Incentive/DisincentiveLS1$22,000.00$22,000.00$22,000.00$22,000.00$22,000.00$22,000.00$22,000.00$22,000.00$22,000.00$22,000.00$22,000.00$22,000.00
2451.511COARSE FILTER AGGREGATE (LV)C Y10$100.00$1,000.00$80.00$800.00$76.88$768.80$61.84$618.40$60.00$600.00$100.00$1,000.00
2501.511"24"" RC PIPE CULVERT"L F442$50.00$22,100.00$44.00$19,448.00$58.26$25,750.92$61.84$27,333.28$60.00$26,520.00$75.00$33,150.00
2501.511"18"" CS PIPE CULVERT"L F592$35.00$20,720.00$24.00$14,208.00$32.65$19,328.80$45.87$27,155.04$44.50$26,344.00$40.00$23,680.00
2501.569"18"" GS SAFETY APRON"EACH18$250.00$4,500.00$202.00$3,636.00$321.43$5,785.74$566.88$10,203.84$550.00$9,900.00$275.00$4,950.00
2501.569"24"" RC SAFETY APRON"EACH12$825.00$9,900.00$525.00$6,300.00$816.73$9,800.76$927.63$11,131.56$900.00$10,800.00$680.00$8,160.00
2502.541"8"" PERF PE PIPE DRAIN"L F165$25.00$4,125.00$8.00$1,320.00$14.04$2,316.60$19.27$3,179.55$18.70$3,085.50$16.00$2,640.00
2502.602"8"" PE INSPECTION TEES"EACH2$500.00$1,000.00$180.00$360.00$376.62$753.24$432.90$865.80$420.00$840.00$300.00$600.00
2502.602"12"" PE INSPECTION TEES"EACH2$1,000.00$2,000.00$675.00$1,350.00$801.04$1,602.08$1,030.70$2,061.40$1,000.00$2,000.00$760.00$1,520.00
2503.51112" SDR 35 PVC Pipe SewerLin Ft135$30.00$4,050.00$31.00$4,185.00$15.14$2,043.90$47.93$6,470.55$46.50$6,277.50$34.00$4,590.00
2503.5118" SDR 35 PVC Pipe SewerLin FT145$25.00$3,625.00$25.00$3,625.00$10.63$1,541.35$40.71$5,902.95$39.50$5,727.50$25.00$3,625.00
2503.51115" SDR 35 PVC Pipe SewerLin Ft245$35.00$8,575.00$35.00$8,575.00$19.50$4,777.50$50.50$12,372.50$49.00$12,005.00$40.00$9,800.00
2515.503ARTICULATED INTERLOCKING BLOCK OPEN CELL,TYPE AS Y36$150.00$5,400.00$170.00$6,120.00$157.98$5,687.28$105.13$3,784.68$102.00$3,672.00$105.00$3,780.00
2540.602RELOCATE MAIL BOX SUPPORTEACH3$50.00$150.00$50.00$150.00$204.00$612.00$51.53$154.59$50.00$150.00$50.00$150.00
2540.602MAIL BOX SUPPORTEACH3$110.00$330.00$110.00$330.00$357.00$1,071.00$103.07$309.21$110.00$330.00$110.00$330.00
2563.601TRAFFIC CONTROLLS1$7,000.00$7,000.00$7,000.00$7,000.00$4,998.00$4,998.00$7,421.03$7,421.03$7,000.00$7,000.00$7,000.00$7,000.00
2573.502SILT FENCE, TYPE MSL F8,200$1.70$13,940.00$1.70$13,940.00$1.73$14,186.00$2.16$17,712.00$2.10$17,220.00$1.70$13,940.00
2573.533SEDIMENT CONTROL LOG TYPE WOOD FIBERL F1,240$2.47$3,062.80$2.47$3,062.80$2.52$3,124.80$2.68$3,323.20$2.60$3,224.00$2.47$3,062.80
2573.550EROSION CONTROL SUPERVISORLS1$2,500.00$2,500.00$1,000.00$1,000.00$12,108.60$12,108.60$5,153.49$5,153.49$5,000.00$5,000.00$1,500.00$1,500.00
2574.508FERTILIZER TYPE 1LB4,000$0.55$2,200.00$0.55$2,200.00$0.56$2,240.00$0.52$2,080.00$0.50$2,000.00$0.55$2,200.00
2574.550COMPOST GRADE 2C Y16$100.00$1,600.00$53.00$848.00$111.66$1,786.56$51.54$824.64$50.00$800.00$85.00$1,360.00
2575.501SEEDINGACRE26$75.00$1,950.00$75.00$1,950.00$76.50$1,989.00$154.60$4,019.60$150.00$3,900.00$75.00$1,950.00
2575.502SEED MIXTURE 25-142LB1,080$3.50$3,780.00$3.50$3,780.00$3.57$3,855.60$3.20$3,456.00$3.10$3,348.00$3.50$3,780.00
2575.502SEED MIXTURE 25-151LB200$2.83$566.00$2.83$566.00$2.89$578.00$3.25$650.00$3.15$630.00$2.83$566.00
2575.511MULCH MATERIAL TYPE 3TON52$250.00$13,000.00$250.00$13,000.00$255.00$13,260.00$180.37$9,379.24$175.00$9,100.00$250.00$13,000.00
2575.519DISK ANCHORINGACRE26$75.00$1,950.00$75.00$1,950.00$76.50$1,989.00$51.54$1,340.04$50.00$1,300.00$75.00$1,950.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3S Y6,650$1.25$8,312.50$1.25$8,312.50$1.28$8,512.00$1.02$6,783.00$0.99$6,583.50$1.25$8,312.50
2575.571RAPID STABILIZATION METHOD 3MGAL8$335.00$2,680.00$335.00$2,680.00$341.70$2,733.60$206.14$1,649.12$200.00$1,600.00$335.00$2,680.00
2582.502"4"" BROKEN LINE PAINT"L F1,200$0.26$312.00$0.16$192.00$0.16$192.00$0.16$192.00$0.157$188.40$0.16$192.00
2582.502"4"" DOUBLE SOLID LINE PAINT"L F2,977$0.52$1,548.04$0.32$952.64$0.33$982.41$0.32$952.64$0.314$934.78$0.31$922.87
2582.502"4"" SOLID LINE PAINT"L F3,950$0.26$1,027.00$0.16$632.00$0.16$632.00$0.16$632.00$0.157$620.15$0.16$632.00
2582.502"6"" SOLID LINE PAINT"L F18,254$0.30$5,476.20$0.20$3,650.80$0.20$3,650.80$0.19$3,468.26$0.188$3,431.75$0.19$3,468.26
2582.603FORMED 4" GROOVE FOR PAINT STRIPELIN FT16,000$0.16$2,560.00$0.01$160.00$0.01$160.00$0.01$160.00$0.01$160.00$0.01$160.00
2582.603FORMED 6" GROOVE FOR PAINT STRIPELIN FT16,000$0.20$3,200.00$0.01$160.00$0.01$160.00$0.01$160.00$0.01$160.00$0.01$160.00
 Totals for project SAP 043-603-030 $2,174,606.88 $2,192,751.88 $2,475,146.86 $2,490,045.71 $2,505,897.61 $2,603,162.64
 
Contract Total:$2,174,606.88$2,192,751.88$2,475,146.86$2,490,045.71$2,505,897.61$2,603,162.64